Articles & Links

Award-Term Contracting: The Right Tool for the Right Environment
This article, written by Dayton Aerospace consultants Gary Poleskey and John Slinkard and appearing in Contract Management Magazine, challenges a previous Award Term article entitled "Award-Term Contracts: Good for Business?" Messrs Polesky and Slinkard assert that the authors of the previous article unjustifiably attacked the award-term technique and strongly discouraged contracting officers from even considering its use.
Read more >

    Download Attachment >

Defense Acquisition Guidebook (Online)
The Defense Acquisition Guidebook (DAG) is designed to complement DoD Directive 5000.1 and DoD Instruction 5000.2 by providing the acquisition workforce with discretionary best practices that should be tailored to the needs of each program.
Read more >

View URL >

FAR Subpart 6.3, Other Than Full and Open Competition (Online)
This subpart prescribes policies and procedures, and identifies the statutory authorities, for contracting without providing for full and open competition.
Read more >

View URL >

OUSD (AT&L) Contract Pricing Reference Guides (Online)
The Contract Pricing Reference Guides are a set of five reference volumes that were developed jointly by the Federal Acquisition Institute (FAI) and the Air Force Institute of Technology (AFIT).
Read more >

View URL >

Past Performance Information Retrieval System (PPIRS)
PPIRS is a web-enabled, government-wide application that provides timely and pertinent contractor past performance information to the Federal acquisition community for use in making source selection decisions.
Read more >

View URL >

State Department Directorate of Defense Trade Controls ITAR (Online)
The Directorate of Defense Trade Controls website contains the International Traffic in Arms Regulation (ITAR) and links to other reference material
Read more >

View URL >

Documents & Briefings

2009 Quadrennial Roles and Missions Review Report
The 2009 Quadrennial Roles and Missions Review (QRM) Report was released to Congress in accordance with the National Defense Authorization Act for Fiscal Year 2008. Although the department has completed similar reviews in the past, this was the first review conducted with the intention of establishing a framework for performing roles and missions analysis on a recurring basis every four years.
Read more >

    Download Attachment >

AFI 63-101, Acquisition and Sustainment Life Cycle Management
This Air Force Instruction implements Air Force Policy Directive (AFPD) 63-1/20-1, Acquisition and Sustainment Life Cycle Management.
Read more >

    Download Attachment >

AFI 65-509, Business Case Analysis
This Instruction provides guidance of the requirements for Business Case Analysis (BCA), implementing the BCA provisions of AMB Circular A-11, DoD 7000.14R, Volume 2B, Chapter 18, and AFPD 65-5. It gives policy guidance and procedures for preparation of BCAs. Compliance is mandatory.
Read more >

    Download Attachment >

AFM 65-510, Business Case Analysis Procedures
This Air Force Manual implements AFI 65-509, Business Case Analysis, by providing specific information on conducting Business Case Analyses (BCA). It applies to individuals at all levels who prepare, manage, review, certify, or approve BCAs.
Read more >

    Download Attachment >

AFMC Award Fee & Award Term Guide
The purpose of this guide is to provide assistance on the application of award fee and award term incentives.
Read more >

    Download Attachment >

AFMC/PK Integrated Product Team Pricing and Negotiation Process
Policy Memo 2009-PK-003 rescinds the AFMC IPT Price Negotiation and Agreement Guide dated May 2004.
Read more >

    Download Attachment >

AFMCPAM 63-101, Risk Management
This pamphlet is intended to provide program managers and their program management team a basic understanding of the terms, definitions and processes associated with effective risk management.
Read more >

    Download Attachment >

AFPAM 63-128: Guide to Acquisition and Sustainment Life Cycle Management
This publication provides guidance and recommended procedures for implementing Integrated Life Cycle Management (ILCM) for Air Force (AF) personnel who develop, review, approve, or manage systems, subsystems, end-items and services procured under Department of Defense Directive (DODD) 5000.01, The Defense Acquisition System and DOD Instruction (DODI) 5000.02, Operation of the Defense Acquisition System.
Read more >

    Download Attachment >

AFPD 62-6, Developmental Engineering, USAF Airworthiness
This Directive establishes policies for formal airworthiness assessments to ensure that AF organizationally operated aircraft are airworthy over their entire life cycle and maintain high levels of safety.
Read more >

    Download Attachment >

AFPD 63-1 and 20-1, Acquisition and Life Cycle Management
This Air Force Policy Directive (AFPD) provides an Air Force acquisition and sustainment integrated life cycle management (ILCM) framework for Air Force systems, subsystems, end-items, service and activities.
Read more >

    Download Attachment >

Air Force Contractor Performance Assessment Reporting System (CPARS) Guide
This document sets policy, assigns responsibilities and provides procedures for systematically assessing contractor performance as required by Federal Acquisition Regulation (FAR) Part 42.
Read more >

    Download Attachment >

Air Force Guidance on Procurement of Automatic Test Systems and Equipment
In response to GAO reports, ATS/ATE requirements will be coordinated through WR-ALC for approval.
Read more >

    Download Attachment >

Air Force Guide - Award Term/Incentive Options
This guide provides general guidance on ways to use Award Term provisions in Air Force contracts.
Read more >

    Download Attachment >

Air Force Implementation of Spiral Development
This briefing, presented by SAF/ACE, outlines the definition of spiral development, the Air Force's focus on implementing spiral development, the new spiral development process and lessons learned.
Read more >

    Download Attachment >

Air Force Software Management Guidebook
This guidebook is the second product of the Air Force Software Systems Strategic Improvement Program (AFSSIP) working group, and provides the next level of definition in setting Air Force acquisition expectations for systems that have significant software content or software-driven functionality.
Read more >

    Download Attachment >

An Orientation to Manufacturing Readiness Levels and Assessments
This briefing, presented by the Air Force Research Laboratory (AFRL), outlines the purpose and procedures for using Manufacturing Readiness Levels (MRL) and Manufacturing Readiness Assessments (MRA).
Read more >

    Download Attachment >

Army Probability of Program Success Operations Guide
The probability of program success initiative is designed to improve the Army's ability to accurately assess a program's probability of success, and clearly / concisely represent that success probability to Army leadership.
Read more >

    Download Attachment >

ASC/CC Policy Memo #08-009: Undefinitized Contractual Actions (UCAs)
This memo, signed by Lt Gen Hudson on 3 July 2008, outlines procedures and guidance designed to improve management and control of UCAs and to maintain good business practices.
Read more >

    Download Attachment >

CMMI for Development (CMMI-DEV) Version 1.2
CMMI(TM) for Development (CMMI-DEV), Version 1.2 is an upgrade of CMMI-SE/SW/IPPD/SS, Version 1.1. The focus of the CMMI Version 1.2 effort is on improving the quality of CMMI products and the consistency of how they are applied.
Read more >

    Download Attachment >

DAU Earned Value Management (EVM) Gold Card
The Defense Acquisition University (DAU) Earned Value Management (EVM) Gold Card provides a handy EVM reference.
Read more >

    Download Attachment >

Defense Acquisition Guidebook, Chapter 3: Affordability and Life-Cycle Resource Estimates
This chapter of the Defense Acquisition Guidebook addresses acquisition program affordability and resource estimation. It provides explanations of the program and pre-program activities and information required by DoD Instruction 5000.2, and discusses the support and documentation provided by the Office of the Secretary of Defense staff elements.
Read more >

    Download Attachment >

Defense Acquisition Guidebook, Chapter 4, Systems Engineering
This chapter of the Defense Acquisition Guidebook facilitates compliance with mandatory systems engineering direction.
Read more >

    Download Attachment >

Defense Acquisition Performance Assessment (DAPA) Report (Kadish Report)
On June 7, 2005, the Acting Deputy Secretary of Defense, Gordon England, authorized a sweeping and integrated assessment to consider "every aspect" of acquisition, giving rise to the Defense Acquisition Performance Assessment Project.
Read more >

    Download Attachment >

DOD AT&L Memo: DAB Preparation Guidance
This memo presents guidance for Defense Acquisition Board (DAB) Meetings, DAB Readiness Meetings (DRM) and DAB Planning Meetings (DPM).
Read more >

    Download Attachment >

DoD Contractor Performance Assessment Reporting System (CPARS) Policy Guide
This document sets policy, assigns responsibilities and provides procedures for systematically assessing contractor performance as required by Federal Acquisition Regulation (FAR) Part 42.
Read more >

    Download Attachment >

DoD Reliability, Availability, Maintainability, and Cost Rationale Report Manual
This DoD Manual is useful to project managers and engineers for planning and designing RAM into systems early in a program.
Read more >

    Download Attachment >

DoD Template for Application of TLCSM and PBL in the Weapon System Life Cycle
The purpose of this template is to provide program managers, their staff, and logistics participants in the acquisition process a tool to assist them in ensuring that effecting sustainment is addressed and accomplished over the life cycle.
Read more >

    Download Attachment >

DoD Weapon System Acquisition Reform Product Assessment Report
The Office of the Secretary of Defense Logistics & Materiel Readiness (OSD/L&MR) established a group of senior government and industry personnel—the Product Support Assessment Team (PSAT)—to assess and offer opportunities for improving product life cycle support. This report has broad implications for PBL implementation.
Read more >

    Download Attachment >

DODI 5000.2 (2 December 2008)
On December 2, 2008, the Honorable John Young, Under Secretary of Defense for Acquisition, Technology and Logistics USD (AT&L) approved a major revision to the DoD Acquisition System (DoD Instruction 5000.02). This revision, the first major change to acquisition policy in over five years, reflects the department’s determination to improve the effectiveness and efficiency of its enterprise-wide acquisition business processes so it can continue to provide warfighters with the best weapons systems and support in the world.
Read more >

    Download Attachment >

DSB Report: Fulfillment of Urgent Operational Needs
This Defense Science Board Task Force Report provides an overview of current procedures to generate, validate, and fulfill urgent operational requirements, both through Service and joint processes. It also describes the oversight of the execution, performance, and transition of the need process and addresses the challenges of responding to urgent needs in an effective and efficient way.
Read more >

    Download Attachment >

Evolutionary Acquisition: EA Template
This template is intended to assist the Program Manager and staff in the preparation of an acquisition strategy reflecting an evolutionary approach to systems development and acquisition.
Read more >

    Download Attachment >

GAO Cost Assessment Guide: Best Practices for Estimating and Managing Program Costs
Because federal guidelines are limited on processes, procedures, and practices for ensuring credible cost estimates, this Cost Guide is intended to fill that gap. Its purpose is twofold - to address generally accepted best practices for ensuring credible program cost estimates and to provide a detailed link between cost estimating and Earned Value Management (EVM).
Read more >

    Download Attachment >

HASC Panel on Defense Acquisition Reform Final Report
The House Armed Services Committee's Panel on Defense Acquisition Reform approved its final report March 23, 2010.
Read more >

    Download Attachment >

Implementation of the Weapon Systems Acquisition Reform Act of 2009
This OUSD (AT&L) memo implements and institutionalizes selected requiremens of the Weapon Systems Acquisition Reform Act of 2009.
Read more >

    Download Attachment >

Introduction to Defense Acquisition Management (Seventh Edition)
This seventh edition provides an update of the regulatory framework from Department of DoDD 5000.1 and DoDI 5000.2 governing the defense acquisition system.
Read more >

    Download Attachment >

JCS Capstone Concept for Joint Operations
This document describes in broad terms Admiral Mullen's vision for the future joint force, circa 2016-2028.
Read more >

    Download Attachment >

Joint Memorandum: Test and Evaluation Policy Revisions
This joint memo (OT&E and AT&L) implements six new policies; integrated DT&OT, increased emphasis on user needs, using both government and contractor data, and others.
Read more >

    Download Attachment >

Manager's Guide to Technology Transition in an Evolutionary Acquisition Environment
This OUSD (AT&L) guide is intended to be a source of information to promote collaboration among team members. It provides an overview of the processes, communities, programs, and challenges associated with technology transition.
Read more >

    Download Attachment >

MIL-HDBK-516B, Airworthiness Certification
This document establishes the airworthiness certification criteria to be used in the determination of airworthiness of all manned and unmanned, fixed and rotary wing air vehicle systems.
Read more >

    Download Attachment >

MIL-STD-2105C, Hazard Assessment Tests for Non-Nuclear Munitions
This Standard describes tests or references to NATO Standardization Agreements (STANAGs) for the assessment of munition safety and insensitive munitions (IM) characteristics of non-nuclear munitions.
Read more >

    Download Attachment >

MIL-STD-882D, Standard Practice for System Safety
This standard practice addresses an approach useful in the management of environmental, safety, and health mishap risks encountered in the development, test, production, use and disposal of DoD systems, subsystems, equipment, and facilities.
Read more >

    Download Attachment >

National Security Strategy (May 2010)
This document outlines the President's National Security Strategy for 2010.
Read more >

    Download Attachment >

Naval Open Architecture Guidebook
This Contract Guidebook is recommended for Industry representatives who are incorporating Naval Open Architecture (NOA) principles into National Security System (NSS) acquisition programs.
Read more >

    Download Attachment >

NAVSEA Instruction 8020.6D, Navy Weapon System Safety Program
This instruction updates and re-issues the responsibilities, authorities, and operational procedures of the Navy's Weapon System Explosives Safety Review Board (WSESRB).
Read more >

    Download Attachment >

NDIA PMSC ANSI/EIA-748-A, Standard for Earned Value Management Systems Intent Guide
This Intent Guide was created by the National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC) to provide additional insight into the Earned Value Management System (EVMS) guidelines included in Section 2 of the ANSI/EIA-748-A Standard for Earned Value Management Systems. It is applicable to either government or industry communities for the purpose of documenting how their earned value management system complies with the ANSI/EIA 748 EVMS Guidelines.
Read more >

    Download Attachment >

OFPP Memorandum on Incentive Contracts
The Office of Federal Procurement Policy (OFPP) issued a policy letter on incentive contracting. It is their attempt to echo the GAO findings of a year or so ago – ensure incentives are tied to cost, schedule, and performance goals and that incentive payments are tied to demonstrated results; i.e., performance-based.
Read more >

    Download Attachment >

OMB Memorandum: Improving the Use of Contractor Performance Information (CPARs)
This memorandum (1) describes new requirements in the Federal Acquisition Regulation (FAR) to strengthen the use of contractor performance information, (2) outlines associated management responsibilities that agency Chief Acquisition Officers (CAOs) and Senior Procurement Executives (SPEs) must take to support robust implementation of these practices, and (3) establishes the review process that the Office of Federal Procurement Policy (OFPP) will use to further improve contractor performance.
Read more >

    Download Attachment >

OPNAV Instruction 8020.14, Department of the Navy Explosives Safety Policy
This policy manual implements and amplifies the mandatory Ammunition and Explosives (A&E) Safety Standards and the explosives safety elements of the Navy Environmental and Natural Resources Program.
Read more >

    Download Attachment >

OPNAVINST 5100.24B, Navy System Safety Program Policy
The objective of this instruction is to provide policy for the implementation of system safety in the Department of the Navy. The objectives of the system safety policy are to eliminate or reduce associated mishap risks and thereby improve operational readiness, reduce life cycle cost, and increase environmental and safety and occupational health for all acquisition programs, over the entire program life cycle.
Read more >

    Download Attachment >

OUSD (AT&L) Memo: Reliability, Availability, and Maintainability (RAM) Policy
This memo, signed by Mr. Young, establishes OSD policy for programs to be formulated to execute a viable RAM strategy that includes a reliability growth program.
Read more >

    Download Attachment >

OUSD (AT&L) Memorandum: Program Office Staffing Plan Management
This recently issued revision of DoDI 5000.2 requires all program managers (ACAT I-III) to include a program office staffing plan as an element of their Technology Development Strategy or Acquisition Strategy.
Read more >

    Download Attachment >

OUSD (AT&L) Memorandum: Earned Value Management and Reporting
To be effective, EVM must be implemented in a disciplined manner consistent with the EVMS guidelines prescribed in ANSI/EIA-748. This memo outlines several DoD contract EVM implementation issues identified by ARA and DCMA and provides a link to a DoD developed EVM Contract Requirements Checklist, as well as other information that will assist contracting officers and program managers in this area.
Read more >

View URL >     Download Attachment >

OUSD (AT&L) Memorandum: Performance Based Logistics (PBL) Business Case Analysis (BCA)
The Defense Business Practice Implementation Board (DBB) review of current PBL efforts recommended the development of consistent BCA guidelines for assessing economic feasibility of PBL.
Read more >

    Download Attachment >

OUSD (AT&L) Memorandum: Performance Based Logistics - Purchasing Using Performance Based Criteria
This memorandum issues guidance on purchasing weapon system logistics support using performance based criteria.
Read more >

    Download Attachment >

OUSD (AT&L) Memorandum: Product Support Boundaries
Through efforts to implement innovative product support strategies to improve readiness and reduce costs, several areas were identified where policy should be adjusted and international standards employed to ensure individual weapon system support strategies fit within our overall support structure for the joint force and coalition operations. These are captured in the reference document "Product Support Boundaries", attached to this memo.
Read more >

    Download Attachment >

OUSD (AT&L) Memorandum: Proper Use of Award Fee Contracts and Award Fee Provisions
The purpose of this memorandum is to state the Department's policy with regard to the proper use of award fee contracts and award fee provisions.
Read more >

    Download Attachment >

OUSD (AT&L) Memorandum: Prototyping and Competition
Many troubled programs share common traits - the programs were initiated with inadequate technology maturity and an elementary understanding of the critical program development path. To rectify these situations, all Military Services and Defense Agency pending and future programs must formulate acquisition strategies and funding that provide for two or more competing teams producing prototypes through Milestone (MS) B.
Read more >

    Download Attachment >

OUSD (AT&L) Memorandum: Total Life Cycle Systems Management (TLCSM) Metrics
This memorandum provides specific definitions of Total Life Cycle Systems Management (TLCSM) metrics formulas for use across DoD and directs their use as the standard set of metrics for evaluating TLCSM.
Read more >

    Download Attachment >

OUSD (L&MR) Memorandum: Life Cycle Sustainment Outcome Metrics
This memo establishes the Materiel Readiness/Sustainment Key Performance Parameter (KPP) and Material Reliability and Ownership Cost KSAs, along with a Mean Down Time definition. Further, it lists 14 Life Cycle Sustainment (LCS) "Enablers".
Read more >

    Download Attachment >

Presidential Memorandum - Agency Use of Alternate Means of Dispute Resolution
This Presidential Memorandum designates Interagency Committees to facilitate and encourage Agency use of alternate means of dispute resolution and negotiated rulemaking.
Read more >

View URL >     Download Attachment >

Procedures and Schedule for FY 2012-16 Integrated Program/Budget Review
This OSD memo outlines the general procedures and schedule for FY 2012-2016 Integrated Program/Budget Review.
Read more >

    Download Attachment >

Risk Management Guide for DoD Acquisition
The purpose of this guide is to assist Department of Defense (DoD) Program Managers (PMs), program offices, and their Integrated Product Teams (IPTs) in effectively managing risks within their acquisition programs.
Read more >

    Download Attachment >

Rules of the Road - A Guide for Leading Successful Integrated Product Teams (IPT)
In May 1995 the Secretary of Defense directed the Department to apply the Integrated Product and Process Development (IPPD) concept of using Integrated Product Teams (IPTs) throughout the acquisition process. The Rules of the Road guide is a "living" doucment, and the guidelines are designed to assist the Program Manager by engaging both OSD and Service staffs in the IPT process.
Read more >

    Download Attachment >

SAF/AQ Memorandum: Air Force Acquisition Business Rules of Engagement
The memorandum implements the SecAF and CSAF's goal of Acquisition Excellence; it provides direction to program managers intended to shape the acquisition culture by balancing the interests of both the warfighter and taxpayer.
Read more >

    Download Attachment >

SAF/AQ Memorandum: Air Force Policy for Award Fee Contracting
This memo endorses the additional policy issued by OUSD/AT&L, DPAP with respect to award fee contracts. In accordance with this policy, when award fee contracts are used the award fee will be earned only when the contractor meets the minimum essential contract requirements.
Read more >

    Download Attachment >

SAF/AQ Memorandum: Reliability, Availability and Maintainability Policy
This Van Buren Memo provides the SAF/AQ response to the 21 July 2008 OUSD (AT&L) memorandum on Reliability, Availability and Maintainability (RAM). The memo attachment provides specific focus areas SAF/AQ is considering for opportunities to improve RAM performance in Air Force weapon systems.
Read more >

    Download Attachment >

SAF/AQ Memorandum: USAF Materiel Development Decision (MDD) Process
Revised DODI 5000.02, Operation of the Defense Acquisition System, requires all potential programs to proceed through a MDD review when entering the acquisition lifecycle framework. This memo clarifies expected MDD roles and responsibilities, and ensures a consistent and thorough MDD review occurs for all potential Air Force programs that have not yet entered the Defense Acquisition Management System.
Read more >

    Download Attachment >

SAF/AQ Memorandum: Use of Non-Government Personnel in Air Force Source Selections
This memo addresses the proper procedures, including organizational conflict of interest, required when using non-government personnel to support an Air Force source selection.
Read more >

    Download Attachment >

SECAF Guidance Memo on CDD Certifications
This memo expands the responsibilities of the SAE and AFMC/CC related to Capabilities Based Requirements Development (AFI 10-601).
Read more >

    Download Attachment >

SECDEF Memo: Department of Defense Efficiency Initiatives
This 16 August 2010 Gates memo directs a series of initiatives designed to reduce duplication, overhead, and excess, and instill a culture of savings and restraint across the DoD.
Read more >

    Download Attachment >

SECNAVINST 5000.2D, Implementation and Operation of the Defense Acquisition System and the Joint Capabilities Integration and Development System
This Instruction issues mandatory procedures for Department of the Navy (DON) implementation of the Defense Acquisition System and the Joint Capabilities Integration and Development System (JCIDS) for major and non-major defense acquisition programs and major and non-major Information Technology (IT) acquisition programs.
Read more >

    Download Attachment >

Systems Engineering Plan (SEP) Preparation Guide
This document guides program teams in generating their program's Systems Engineering Plan (SEP) regardless of the acquisition category (ACAT) level of the program.
Read more >

    Download Attachment >

The Program Manager's Guide to the Integrated Baseline Review (IBR) Process
This Guide is the principal IBR reference and should be used to implement an integrated baseline discipline on an acquisition program. Program Manager's are strongly encouraged to use this Guide during IBR training, when preparing for an IBR, and then again during the actual execution and conduct of the IBR.
Read more >

    Download Attachment >

US Army Materiel Command: Partnering for Success
Too often the acquisition process is undermined by adversarial relationships, suspicion between the government and industry, volumes of paperwork and costly litigation. We can no longer afford to do business in this manner. This Guide provides the acquisition community with a tool that can maximize the potential for achieving contractual objectives. This tool is called Partnering.
Read more >

    Download Attachment >

USAF Guidance Memo: Prototyping and Competition
This joint SAF/AQ and SAF/US(D) guidance memo implements the USD(AT&L) requirement for prototyping in competition during the Technology Demonstration acquisition phase.
Read more >

    Download Attachment >

USAF Source Selection Revisions
This SAF/AQCP briefing describes the new USAF Source Selection policy revisions. The new policy elevates cost/price risk as a separate evaluation factor.
Read more >

    Download Attachment >

Winning Proposal Fundamentals - Back to Basics
This briefing, developed by Dayton Aerospace for an industry business development workshop, covers ten fundamentals for winning proposals.
Read more >

    Download Attachment >

Past Performance

AFMCPAM 63-5, Integrated Master Plan and Schedule Guide
Dayton Aerospace was tasked by AFMC to author a revision to the AFMCPAM 63-5, Integrated Master Plan and Schedule Guide.
Read more >

    Download Attachment >

Air Force Materiel Command (AFMC) Request for Proposal (RFP) Improvement Study
Headquarters Air Force Materiel Command (HQ AFMC) contracted with Dayton Aerospace to investigate and better understand issues surrounding current government Requests for Proposals (RFPs). Specifically, Dayton Aerospace was tasked to gather data, analyze the data, determine findings, and develop recommendations from industry for HQ AFMC on how Air Force RFPs can be improved.
Read more >

    Download Attachment >

Common Low Observables Verification System (CLOVerS) Independent Review Team
In a rapid response mode, DAI put together a multi-disciplined team and executed an independent review of the complex Common Low Observables Verification System (CLOVerS) program.
Read more >



Dayton Aerospace Authors Peacekeeper Case Study for AFIT/CSE
Dayton Aerospace consultants Dr. Bill Stockman, LTC, USAF (Ret) and Gordon Fornell, Lt Gen, USAF (Ret) authored the Peacekeeper Intercontinental Ballistic Missile Systems Engineering Case Study.
Read more >

View URL >

Guide for Integrating Systems Engineering into DoD Acquisition Contracts
Dayton Aerospace was tasked by OUSD (AT&L) to author a guidebook with the primary purpose of aiding the Program Manager and Lead (or Chief) Systems Engineer to effectively integrate systems engineering requirements into appropriate contracting elements in support of system acquisition.
Read more >

    Download Attachment >

Integrated Project Management Handbook
Dayton Aerospace was contracted to write this handbook for OSD. It is based on the premise that the multi-functional disciplines inherent to both Government and industry acquisition agencies are integral parts of program management and must be fully integrated to ensure successful integrated project management of DoD programs.
Read more >

    Download Attachment >

Joint Strike Fighter (JSF) Performance Based Logistics (PBL) Business Case Analysis (BCA)
Dayton Aerospace conducted the Business Case Analysis (BCA) to assess the Performance Based Logistics (PBL) approach against the organic alternative of logistics support using a tailored process we developed and refined on a similar effort for the CV-22. Click 'Read More' to view extended coverage on how we successfully completed this effort.
Read more >



OUSD (AT&L) Modular Open Systems Approaches (MOSA)
In support of the OUSD (AT&L) initiative to revitalize systems engineering and obtain the benefits of acquisition initiatives such as evolutionary acquisition and modular open systems approaches (MOSA), DAI consolidated a set of systems engineering and management concepts designed to improve the execution performance of DoD programs.
Read more >



SAF/AQ Early Issue Identification and Resolution (EIIR) Workshop Development
Dayton Aerospace and its subcontractor, Center for Dispute Resolution (CPR), successfully developed and delivered the Early Issue Identification and Resolution (EIIR) Workshop for SAF/GCD.
Read more >



Point Papers & Product Sheets

Airworthiness Certification - From Winning Proposals to Delivering Capable Systems
Dayton Aerospace experience shows that many programs do not recognize how the Airworthiness Certification process impacts proposal preparation, systems engineering efforts during systems development and demonstration, and maintenance of airworthiness of operational systems.
Read more >

    Download Attachment >

Alternative Dispute Resolution (ADR) - A Different Approach to Solving Problems
The wisdom and concepts underlying Alternative Dispute Resolution (ADR) have been around a long time. But somehow the world of government contracting evolved into an increasingly rigid and inflexible system. That rigid system is changing. The Dayton Aerospace process for implementing ADR was developed while successfully facilitating actual ADRs for multimillion dollar disputes on major weapon systems.
Read more >

    Download Attachment >

Building Better RFPs - More Effective Communication with Industry
Dayton Aerospace consultants are seasoned experts who have led and participated in numerous Government source selections and industry proposals. We offer a powerful combination of both RFP and subject matter experts. Our RFP development support is tailored to specific client and solicitation needs, evolving as requirements change.
Read more >

    Download Attachment >

Building Winning Proposals - Capture Planning and Proposal Support
The key to a winning proposal is integrating and focusing the proposal team, and then using a disciplined and structure proposal process that is tailored to specific customer requirements. Our proposal consultants are both proposal and subject matter experts - a powerful combination!
Read more >

    Download Attachment >

Business Case Analysis - Building a Credible BCA
The Dayton Aerospace Team Business Case Analysis (BCA) approach provides highly experienced and credible team leadership able to understand and communicate effectively with your decision makers.
Read more >

    Download Attachment >

Competitive Assessments - The Right Way to Winning Proposals!
The most effective way to build a Winning Proposal is by starting with a structured competitive assessment tailored to your needs. Our proven process ensures you build the right team, compares you with your competitors, and provides an impartial facilitator.
Read more >

    Download Attachment >

Corporate Compliance - Ethics and Procurement Integrity
New mandatory compliance requirements established in the Federal Acquisition Regulation (FAR) Part 3.10 and effective December 2007 apply to most government contractor companies. The Dayton Aerospace team provides for rapid development and enhancement of complete Contractor Ethics and Compliance Programs for all types and sizes of companies doing business with the Government.
Read more >

    Download Attachment >

Dayton Aerospace People - Our Greatest Asset!
Dayton Aerospace is a "hands on" partner, with a wealth of experience from both participating in government source selections and assisting with industry proposals. We work shoulder-to-shoulder with your experts.
Read more >

    Download Attachment >

Early Issue Identification and Resolution (EIIR) - One Key to Better Program Execution
The Dayton Aerospace EIIR Workshop objective is to improve program execution by providing joint training for Government and Industry that promotes early identification and resolution of issues in controversy, facilitates active management of issues throughout their life cycles, and helps to avoid program delays and excessive costs of disputes and litigation.
Read more >

    Download Attachment >

Full Spectrum Proposal Review Support - Using Cross-Functional Senior-Level Expertise
Winning proposals effectively communicate your strategy in ways which resonate with the source selection team. Our consultants have both built proposals and evaluated proposals - a discriminator!
Read more >

    Download Attachment >

Government Acquisition Fundamentals Workshop
The Dayton Aerospace Government Acquisition Fundamentals Workshop provides a knowledge-level overview of the DoD Systems Acquisition Process and the interrelating industry activities enabling the business development student to more effectively market within the confines of the DoD customer acquisition process.
Read more >

    Download Attachment >

Government Modular RFP Workshops Provide Just-in-Time IPT Training
Dayton Aerospace workshops are designed to be provided directly to Government Integrated Product Teams (IPTs) working specific programs.
Read more >

    Download Attachment >

Industry Modular Proposal Workshops Provide Just-in-Time IPT Training
Our industry modular proposal workshops are designed to assist the program manager in leading the IPT through the acquisition planning, RFP, source selection and program execution process.
Read more >

    Download Attachment >

Integrated Baseline Review (IBR) - Be Ready to Execute (Government Support)
DoD Program Managers must conduct an IBR on contracts with Earned Value Management (EVM) requirements. Dayton Aerospace has a proven process to help you successfully execute the IBR.
Read more >

    Download Attachment >

Integrated Baseline Review (IBR) - Be Ready! (Industry Support)
DoD Program Managers must conduct an IBR on contracts with Earned Value Management (EVM) requirements, generally within six months of award. Dayton Aerospace has a proven process to help your program team pass the IBR - the first time!
Read more >

    Download Attachment >

Integrated Master Schedule - A Foundation for Successful Program Execution
An Integrated Master Schedule (IMS) is a fundamental element of planning and managing a successful program from winning the contract to profitable execution. It provides the visibility and leverage you need in today's competition for limited budgets.
Read more >

    Download Attachment >

Integrating Schedule and Risk - A Powerful Management Combination
Creating an Integrated Master Schedule (IMS) is a critical step in planning a successful program. Equally as important is determining the program risks.
Read more >

    Download Attachment >

Performance Based Logistics Business Case Analysis
The Dayton Aerospace core PBL BCA process was developed as a tool to support the rigorous requirements of a major program decision point. Our PBL BCA teams consist of highly experienced, cross-functional personnel whose backgrounds and expertise span program management, integrated logis-tics support, contracting, engineering, and financial management.
Read more >

    Download Attachment >

Performance Based Logistics Corporate Competency Development
Dayton Aerospace provides full-spectrum PBL competency development support tailored to meet your needs. Our PBL experts will work side by side with company leadership to develop a successful “PBL Center of Excellence”.
Read more >

    Download Attachment >

Performance Based Logistics Implementation & Execution Support
Dayton Aerospace has extensive PBL implementation capabilities. Specifically, we can: develop Program Logistics Global Sustainment Organization and PBL Transition Plan; identify and describe the significant events required to develop a PBL implementation plan; and support development and implementation of a PBL Strategy.
Read more >

    Download Attachment >

Performance Based Logistics Support
The Dayton Aerospace Performance Based Logistics (PBL) Team has developed a knowledgebase of over five years with multiple government and industry clients. We can assist your organization each step of the way - from initial strategy and contracting actions, to defining financial arrangements, to developing workload sharing via public-private partnerships.
Read more >

    Download Attachment >

Services Expertise - Producing Winning Proposals
The Dayton Aerospace team provides your team the winning edge - with the extensive breadth and depth of Services expertise to product winning proposals.
Read more >

    Download Attachment >

Sustainment/Acquisition Composte Model (S/ACOM)
The Sustainment/Acquisiton Composite Model is a validated and approved Air Force Materiel Command (AFMC) tool - proven to accurately estimate aggregate Program Office manpower.
Read more >

    Download Attachment >

Training Systems Expertise - Producing Winning Proposals!
For Must Win proposals the Dayton Aerospace team provides the winning edge. Dayton Aerospace has the extensive breadth and depth of Training Systems expertise to produce winning proposals:
Read more >

    Download Attachment >